| Expo Shanghai Special Tunnel East Line Opens First |
|
| Date:17/08/2008 |
|
|

The first large-sized tunnel shield "Eagle 2" with leading design and
manufacturing by Shanghai No. 2 Municipal Engineering Co., Ltd. of Shanghai
Urban Construction finally came out of the river tunnel in Xizang Road South at
the west side of the Huangpu River, signaling the first run through of the East
Line of Expo Shanghai special tunnel. The project of crossing river tunnel in
South Xizang Road is located in the designated area of Expo Site, between Lupu
Bridge and Nanpu Bridge. The passenger flow of the tunnel after finishing is
designed at 60 to 70 thousand per hour, reaching the high requirement. The
tunnel starts from the intersection of Xizang Road South and Zhongshan Road
South to Southeastward covering a distance of 2.67km, with 1,170m under the
river and a diameter of 11.58m, and finishes at the intersection of South Pudong
Road and Gaoke Road West. The tunnel will be opened to the public after the
completion of Expo Shanghai and become another main passage connecting South and
North of the city across the river.
|
|
|
|
|
|